December 9, 2004
Riser Construction Complete
I completed the riser today, as expected. It looks pretty good considering this is the first time I've ever put down carpet. After finishing the last side of the platform, I created the steps in the same manner as the platform: roofing felt on the bottom where it touches the floor, the rounded lip (only on 3 sides), carpet padding, and then carpet. Ran out of the dining room carpet leftovers, so I used the carpet leftover from covering the wall behind my refrigerator. Different pile but same color. I'll put up pictures soon.
Posted by josuah at December 9, 2004 6:27 AM UTC+00:00
Trackback Pings
TrackBack URL for this entry:
http://www.wesman.net/cgi-bin/mt/mt-tb.cgi/69
Comments
Post a comment
Thanks for signing in, . Now you can comment. (sign out)
(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)